Gippsland Water are currently upgrading Drouin WWTP to have the capacity to treat 4.2 MLD of sewage from the township of Drouin. As part of the new Membrane Bioreactor (MBR) Activated Sludge process, Hydroflux EPCO were contracted to design and...
Gippsland Water are currently upgrading Drouin WWTP to have the capacity to treat 4.2 MLD of sewage from the township of Drouin. As part of the new Membrane Bioreactor (MBR) Activated Sludge process, Hydroflux EPCO were contracted to design and...
Hydroflux's latest broadsheet newsletter with informative articles on the local water industry, the Hydroflux group's activities and people. Please click on the cover below, or click here to read an electronic pdf version. Contents of this Issue; • Can the Food Industry Survive Drought? • The...